-
How to choose the right steel structure model? According to the load requirements, span and use environment, refer to the product manual or consult the technical team to match the model with the corresponding strength and anti-corrosion grade.
-
How long does the customization process take? After the demand is confirmed, the design cycle is 3-5 days, Provide a specific delivery time based on the order quantity, usually 7-15 working days. Urgent orders can be prioritized for production scheduling.
-
What are the requirements for installation guidance? A flat foundation, power supply and lifting equipment must be provided, and the technical staff must complete the safety enclosure before arriving on site to ensure that the working surface is unobstructed.